While selecting a plot, proper responsibility to be practised by following the essential factors for the plot choice for building a house.
Rectangle and Square plots are most suitable for construction.
2. Planning to build dream home as per building codes
Creating the home consists of designs with floor plans, site locations
walls and roof specifications. Licensed architects produce these designs.
Structural drawings include shuttering & reinforcement details.
3. Quantity calculation & learning the expense of building a house.
Building a house requires a huge quantity of material and budget.
Material quantities & complete expense of construction requires to be determined.
Building estimator or construction cost estimator will produce the expense of building house details.
If gathering money is shorter than estimated costs, require to go for the house loan.
4. Getting Permission from Governments.
Require to take permissions from the municipal body before commencing soil excavations. The following are the listing of documents required before applying for permissions.
a. Land survey statements,
b.soil test records and procured land documents,
c.Architectural designs with architect certification,
d.structural designs with structural engineer certification,
e. Obtaining Undertaking certificate of civil engineer for construction.
5. Requesting a house contractor or general constructor to build dream home.
A house builder or constructor will build the house.
Proper attention to be practised while choosing a constructor or builder to build dream home.
During-construction steps for house construction:
From the earlier 48 fast steps,6 to 38 comes below During-Construction steps to build dream home.
When construction work involves the procurement of materials, the accomplishment of works like base works and superstructure slab, brick masonry, plastering etc works as discussed above & monitoring of the site.
Post-construction steps for house construction
house construction-interiors
From the earlier 48 fast steps,39 to 48 comes below Post-Construction steps to build dream home.
When post-construction tasks include superstructure completing works and controlling the site.
Conclusion:
From the above 48 steps, one can get a basic idea and steps involved in constructing a new independent house or new house construction.