Scaffolding|18 erection,dismantle points

scaffolding for house construction

Scaffolding erection, dismantle is done when works need to perform over 2 metres from ground level to support workers, materials utilised in house construction, repair, maintenance, demolition work at height.

18 Safety points for scaffolding erection

scaffolding for house construction
scaffolding for house construction

Before scaffolding erection site survey to be performed for any hazards. For example

  • Any high tension wires nearby before scaffolding erection,
  • Safe access for equipment operation present or not before scaffolding erection.
  • Danger zones if any before scaffolding erection.

The following 18 points need to be kept in mind before and during scaffolding erection:

  1. From bottom level to top-level and from internal part to external part work scaffolding erection  should be started.
  2. Safety cordons, Warning signs and other safety measures shall be implemented to ensure safety for the traffic during scaffolding erection.
  3. The minimum clear height of 2.5 metres should be maintained over pedestrian traffic areas for protecting the traffic from unexpected impact.
  4. By keeping a clear distance of 2 m from the scaffold structure, barricades should be provided.
  5. To make sure proper access should be kept for cable tunnels, fire hydrants, fire alarms etc.
  6. Before scaffolding erection make sure Scaffolds of steel should be of tubular and should comply to IS:2750 when used for work at height.
  7. For over headworks proper protection above the work platform scaffold should be done not more than 3m.
  8. For personal movement under the scaffold at the working level, a screen or canopy should be provided with a minimum of 300 mm height projection.
  9. In storm work or high wind, erection should be avoided.
  10. Works on ice or snow-covered platform should be avoided.
  11. To support the load without settlement vertical poles should rest on a strong foundation and soft ground should be well levelled and rammed.
  12. Fixing of nails or fibre ropes, steel bolts of approved size, couplers, joint pins should be fixed properly.
  13. To ensure structural stability and to stop bucking, diagonal bracing should be tied.
  14. For heights, more than 15 metres steel scaffold is preferred instead of a wooden one.
  15. Scaffold height should not be greater than 4 times its minimum base dimensions unless braces or ties, guy ropes are utilised.
  16. Scaffolds more than 10 m height should be secured for stability at first utilising the fixed structure and for every 8 m height should be provided.
  17. Landing platform with standard rails at every 6 m height should be provided.
  18. For scaffold users, safe access should be provided for work at height.

Use of scaffold for work at height after erection

scaffolding work at height
scaffold work at height

For house construction or any other work at height, Scaffolds should be used utilised only after duly inspected by a certified engineer.

The following scaffolding safety points should be kept in mind while using for work at height:

  1. All workers or employees who utilise scaffolds should be trained.
  2. Should be used only when it is tagged OK.
  3. Prior to the start of all works, Hazard identification and Risk assessment should be done and proper preventive measures should be implemented during these activities.
  4. All users should utilise the following PPE’s like a full-body harness with twin lanyard of 1.8 m, snap hook, ISI or CE marked helmet with chin straps, Safety shoes, safety goggles, cotton hand gloves etc.
  5. While climbing user should not carry any material in hand.
  6. To prevent falling of tools, other materials proper protection should be implemented by utilising scaffolding safety nets below the working area, by tying the tools with rope etc.
  7. While climbing a vertical ladder above 6 m height, the user should utilise the vertical fall arrest system. In the absence of this vertical fall arrest system, the user shall ensure that three-point contact is maintained all the time by anchoring lanyard hook one after another.
  8. End frames and cross bracing should not be used for access.
  9. Beyond the working load limit, the scaffold should not be loaded.
  10. Even if handrail,mid-rail is provided, the user shall ensure anchoring harness.
  11. Always user should face the ladder when descending or ascending and should not slide down a ladder.
  12. Before climbing make sure that the shoes are not muddy, greasy, slippery.
  13. Users are not allowed to modify the scaffold position or remove any of its components.
  14. While using electrical tools, machinery user should ensure that scaffold grounding is done.
  15. No heavy or hazard material like gas cylinders, welding machines etc should not be kept on the scaffold until or unless it is designed to take that load.
scaffolding safety net
scaffold safety net

Scaffold Hazards

The following are hazards :

  • Falling objects
  • Scaffold collapse
  • Electrocution
  • Falls

The following are the possible reasons for hazards:

  1. Inadequately supported scaffold boards
  2. Faulty or unsuitable usage of the construction material.
  3. Usage of wrong or damaged couplers.
  4. The lack of toe boards or guard rails.
  5. Scaffold overloading.
  6. Scaffolding erection on uneven ground.
  7. Slippage due to usage of unsecured ladders.
  8. Improper usage of platform thickness and width.
  9. No proper bracing the scaffold to the structure.

Inspection of scaffold

Proper inspection to be done before the usage of the scaffold. The initial inspection should be done after 7 days and after every damage.

The following are the few scaffolding safety checks during the inspection for work at height:

  1. Check for alignment and level of members is proper or not.
  2. Check for couplers are tightened properly or not.
  3. Check for all planks are placed properly or not.
  4. Check mid-rails, handrails, toe boards are fixed properly or not.
  5. Check for adequate lighting is present or not.
  6. Check for weather the scaffold is overloaded with materials or tools or debris.
  7. Check for safe access is present or not.
  8. Check for safety tag for the scaffold is filled properly or not.
  9. Check for if there are any defects in scaffolds like crack, bends, corrosion etc.

Scaffolding safety in Dismantle

scaffolding dismantling
scaffolds dismantling

Before dismantling, Hazard identification and risk assessment should be performed.

The following scaffolding safety points should be kept in mind before and during dismantling and for work at height.

  1. Dismantling work should be allowed with sufficient time and to be handled safely.
  2. Before dismantling scaffold should be inspected for stability and strength. The components which endanger the stability of the remaining structure should not be removed.
  3. Materials stacked and all the debris on the scaffold should be eliminated.
  4. Proper barricading should be done at ground level using barricading tapes, warning signages should be displaced for preventing from preventing persons from entering the work area.
  5. In reverse order to erection i.e from top to bottom, dismantling should be performed.
  6. Bracing should be removed first followed by removing all the horizontal members in a single plane.
  7. After reaching the second last level, bracing of 3 m from ground level shall be installed before dismantling horizontal members at the second level.
  8. Only in the presence of experienced or competent persons dismantling work should be performed.
  9. Materials should not be thrown from heights bit should be lowered down using ropes.
  10. After completion of work, all materials should be stocked in dry protected places and proper stacking to be done using trays or boxes, racks at ground level.
  11. The damaged parts would be repaired or replaced, cleaned and treated with paint or preservatives.
  12. Proper lubrication should be done for couplers, other components.

Conclusion:

Scaffolding safety should be considered before, during erection and during, after dismantling for house construction works, other work at height and all the above-mentioned points should be kept in mind while doing the same.

Read Also:

48 quick steps for house construction

Plots|7 best tips for home construction

About Ashwini Kumar

Ashwini Kumar is a graduate in civil engineering from NIT Warangal. He has 8+ years of experience in the construction field. He is the author, founder of the Easy Home Builds blog

View all posts by Ashwini Kumar →

71 Comments on “Scaffolding|18 erection,dismantle points”

  1. Hey There. I discovered your blog the use of msn. This is a very neatly written article. I?ll be sure to bookmark it and return to read more of your useful information. Thank you for the post. I?ll certainly return.

  2. I think that is one of the so much significant information for me. And i’m glad reading your article. But wanna statement on few basic issues, The website style is wonderful, the articles is really great : D. Just right job, cheers

  3. Whats up! I just wish to give an enormous thumbs up for the great info you’ve got right here on this post. I might be coming again to your blog for extra soon.

  4. I do accept as true with all the ideas you have introduced on your post. They’re really convincing and can definitely work. Nonetheless, the posts are very short for beginners. Could you please extend them a little from next time? Thanks for the post.

  5. Good day! I just want to give a huge thumbs up for the nice data you could have right here on this post. I might be coming again to your blog for extra soon.

  6. Very great post. I just stumbled upon your weblog and wanted to say that I have truly loved browsing your weblog posts. After all I?ll be subscribing on your rss feed and I hope you write once more very soon!

  7. I appreciate, cause I found just what I was looking for. You’ve ended my 4 day long hunt! God Bless you man. Have a great day. Bye

  8. Thank you for another great article. Where else could anybody get that type of information in such a perfect way of writing? I’ve a presentation next week, and I am on the look for such info.

  9. My brother recommended I might like this blog. He was entirely right. This post actually made my day. You can not imagine just how much time I had spent for this info! Thanks!

  10. This is very interesting, You are a very skilled blogger. I’ve joined your feed and look forward to seeking more of your excellent post. Also, I’ve shared your website in my social networks!

  11. Hi, Neat post. There’s a problem with your website in internet explorer, would check this? IE still is the market leader and a large portion of people will miss your great writing because of this problem.

  12. Thank you for another informative web site. Where else could I get that kind of information written in such an ideal way? I’ve a project that I am just now working on, and I’ve been on the look out for such information.

  13. There are some interesting points in time in this article but I don?t know if I see all of them middle to heart. There’s some validity however I’ll take hold opinion till I look into it further. Good article , thanks and we wish more! Added to FeedBurner as effectively

  14. My spouse and I stumbled over here coming from a different web address and thought I should check things out. I like what I see so now i’m following you. Look forward to looking at your web page yet again.

Leave a Reply

Your email address will not be published. Required fields are marked *